BIOROCK-S Installation in Berkshire

BIOROCK-S Installation in Berkshire

Location

Maidenhead, Berkshire

Project

2 Bedroom Annex with Studio.

System

BIOROCK-S System with ST1-2000 Primary Tank & BIOROCK-S Treatment Unit

Background

The client had the option to connect to the mains but the costs, permitting time, and access permits proved prohibitive. As the plant was to be located quite close to the building the client also wanted a plant without noise and with minimum maintenance. It was also planned to discharge to a nearby stream and required a high-quality final effluent.

Installation

Installation was carried out by the clients' contractor under the supervision of a BIOROCK engineer and was completed in less than 2 days.

Do you want to get in contact with us?

Hello, I’m José Manuel Rodríguez , BIOROCK’s International Sales Director. Contact us now for a FREE project assessment

Where are you located?

Who are you?

Your contact data

Phone prefix is set automatically after selecting country

What is your interest?

If you choose other please specify in the remarks field

Please tell us about your requirements