Mours Saint Eusebe, Drôme, France
A new residential area is not connectable to the mains and thus requires the installation of a 60 PE decentralized treatment plants.
60 PE
Demeures Drômoises
Charignon Installations
Use of electricity for sewage pumps upstream of the system. No use of electricity for the processing phase. 15 meters of soil infiltration drains were recommended by the SPANC (local authorities) downstream of the system.